KIA Motors Slovakia – Extension of Preassembly Shop – Žilina

The project deals with the extension of the existing building SO 430 Pre-assembly hall on completion of a Warehouse where components for assembly of vehicles are stored in the racking system. Architectural solution respects the original elevations of the building and the selection of materials incorporated with the original hall to create uniform whole.

Designed area:
Pre-assembly hall
15 606 m2
Warehouse of aluminum wheel
795 m2

Kategórie