Relocation of the state road II/583 – Žilina

The construction dealt with the relocation of existing road II/583, the part from the bridge across the river Váh up to the connection to road II/583 behind the municipality of Gbeľany near Žilina.
The relocation makes the car production plant KIA Motors Slovakia and MOBIS Slovakia accessible and thus enables a direct interconnection satisfactory in terms of capacity with the road network of the SR.
The whole part of the road relo- cation was equipped with a road drainage system. The part around premises of the plants was equipped with a public lighting.

Kategórie